Services

  • Electrical Studies

    • Short-Circuit and Selectivity Studies
    • Incident Energy Studies (Arc Flash / ATPV)
    • Harmonic Distortion and Filter Studies
    • Power Flow and Load Studies
    • Rotating Machinery Start-Up Studies
    • Reactive Power Studies (Capacitor Banks)
    • Electromagnetic Studies (Electric Field and Magnetic Field)

  • Comissioning of Electrical Systems

    • Substation Comissioning
    • Medium Voltage Primary Switchgear Comissioning
    • Cubicle and Panel Commissioning
    • Transformer Comissioning
    • Relay and Circuit Breaker Comissioning
    • Protection and Measurement System Comissioning
    • Busway Comissioning

  • Critical Mission Systems and Data Center Commissioning

    • Generator Commissioning
    • UPS (No-Breaks) Commissioning
    • Comissioning / Integrated Testing of Critical Mission Systems
    • RPP and PDU Commissioning

  • Preventive Maintenance

    • Preventive Maintenance in Substations
    • Preventive Maintenance in Medium Voltage Primary Switchgear
    • Preventive Maintenance on Power Supply Entrances

  • Predictive Maintenance

    • Thermography in Industrial Electrical Systems
    • Ultrasound in Industrial Electrical Systems
    • Load and Energy Consumption Analysis

  • ADPS / Lightning Rods Studies, Measurements and Reports

    • ADPS Report / Lightning Rod Report
    • ADPS Resistance Measurement
    • ADPS Design Projects
    • Risk Analysis according to NBR5419:2015

  • Grounding Studies, Measurements and Reports

    • Grounding Measurements / Reports
    • Grounding and Soil Stratifications Studies
    • Grounding Grid Design
    • Step and Touch Voltage Calculations
    • Equipment Grounding Reports
    • Building Grounding Reports
    • Substation Grounding Reports

  • Equipment and System Testing and Trial

    • Insulation Resistance Test / Trial – Megger
    • Applied Voltage Test / Trial – Hipot
    • Current Injection in Relays Test / Trial – Calibration Box
    • Contact Resistance Test / Trial – Micro-Ohmmeter
    • Winding Resistance Test / Trial – Micro-Ohmmeter
    • Transformer Turns Ration Test / Trial – TTR
    • Ground Resistance Test / Trial – Earth Tester
    • Ohmic Resistance Test / Trial of Ground and ADPS – Earth Tester / Micro-ohmmeter
    • CT Saturation Test / Trial

  • Power Quality Measurements / Studies

    • Load, Demand and Consumption Measurements / Studies
    • Disturbance, Surge and Power Spike Measurements / Studies
    • Harmonic Measurements / Studies and Filter Design
    • Capacitor Bank Measurements / Studies
    • Power Outage Measurements / Studies
    • Short-Term Voltage Variation (STVV) Measurements / Studies
    • High-Frequency Transient Measurements / Studies
    • Flicker Measurements / Studies
    • Notch Measurements / Studies

  • Schneider Low Voltage Circuit Breaker Tests

    • Current Injection Testing on Schneider Circuit Breakers with Micrologic, STR or NSX protection Units

  • Work Safety and NR-10

    • Electrical Installation Inspections / Reports
    • Primary Switchgear Inspections / Reports
    • Documentation Development in Compliance with NR-10

We create a project that meets your needs