NR-10 now has three voltage levels

New NR-10 voltage levels: electrician inspecting an industrial electrical panel, EA Engenheiros Associados banner

NR-10 now has three voltage levels

NR-10 now has three voltage levels: low, medium and high. The change came with Ordinance MTE No. 737/2026, and it alters how every electrical installation is classified.

At first glance, it looks like a matter of definitions. In practice, however, the range your installation falls into now decides which documents you must keep, how your team must be trained and what inspectors will ask for.

In this article, you will see the new limits, what changed from the previous text and how to review your plant’s classification before June 2027.

NR-10 is Brazil’s Regulatory Standard No. 10, which covers safety in electrical installations and services.

What changed in NR-10 with Ordinance MTE No. 737/2026

Ordinance MTE No. 737, dated May 29, 2026, was published in Brazil’s Official Gazette (DOU) on June 1, 2026. It approves a new text for NR-10 and revokes Ordinances MTE No. 598/2004 and MTPS No. 508/2016.

The standard takes effect one year after publication, that is, in June 2027. This period gives companies time to adapt their installations, documents and training.

The main changes in the new standard include:

  • integration of electrical risk into the GRO and the PGR, Brazil’s occupational risk management framework under NR-1;
  • de-energization as the priority measure, following the hierarchy of controls;
  • arc flash addressed explicitly, with an incident energy study required in defined situations;
  • a new criterion for the Electrical Installations Record (PIE);
  • mandatory in-person practical content in training;
  • the creation of a medium voltage range.

This article focuses on the last point. After all, it directly affects several of the others.

The three voltage levels in the new NR-10

The previous text worked, in practice, with two levels. Low voltage went up to 1,000 V AC or 1,500 V DC. Anything above that was high voltage.

As a result, a 13.8 kV switchroom and a 138 kV substation fell into the same category. The new NR-10 splits that range in two. The limits are as follows:

Level Alternating current (AC) Direct current (DC)
Low voltage (LV) above 50 V and up to 1,000 V above 120 V and up to 1,500 V
Medium voltage (MV) above 1,000 V and up to 36,200 V above 1,500 V and up to 3,000 V
High voltage (HV) above 36,200 V above 3,000 V

 

Values are measured phase to phase or phase to ground.

What about extra-low voltage?

Below low voltage sits extra-low voltage: up to 50 V AC or 120 V DC. Under item 10.2.4, NR-10 does not apply to installations supplied at extra-low voltage, except for compliance with item 10.6.6 and its sub-items.

That is why we speak of three levels within the scope of the standard.

Where the most common industrial voltages fall

The new ceiling of 36,200 V AC covers the distribution voltages most common in Brazilian industrial plants, such as 13.8 kV and 34.5 kV. Meanwhile, subtransmission voltages such as 69 kV and 138 kV remain high voltage.

In practice: which range is your installation in?

Here are some classification examples based on the new limits:

  • Distribution board at 220/380 V: low voltage.
  • Motor control center at 440 V or 690 V: low voltage.
  • PV plant strings at up to 1,500 V DC: low voltage.
  • Factory primary switchroom supplied at 13.8 kV: medium voltage.
  • Utility service entrance at 34.5 kV: medium voltage.
  • Substation at 69 kV or 138 kV: high voltage.

Note that many plants supplied at medium voltage by the utility have left the high voltage category. However, this does not reduce the risk of these installations. What changes is the classification and, with it, the rules that apply.

Why the voltage level changed the PIE criterion

Under the previous text, the Electrical Installations Record (PIE) was mandatory for sites with more than 75 kW of installed load. That criterion no longer exists.

Under item 10.15.6 of the new NR-10, the documentation in items 10.15.4 and 10.15.5 must be organized as a PIE when the organization:

  1. is part of the Electric Power System (SEP); or
  2. carries out activities in medium or high voltage electrical installations.

In other words, the trigger is no longer installed power. Instead, it is the type of installation and the voltage level.

Example: two companies, two outcomes

Picture a shopping center supplied only at low voltage, with 120 kW of installed load. Under the old rule, it needed a PIE. Under the new one, the obligation to organize its documentation in that format no longer applies.

Now picture a small factory with a 13.8 kV switchroom and 60 kW of load. Before, it was below the 75 kW limit. Now, because it carries out activities at medium voltage, it must keep a PIE.

No PIE does not mean no documentation

Even companies released from the PIE obligation remain responsible for managing electrical risk. NR-10 requires, for example, that the organization keep the electrical design and records of grounding system inspections and measurements.

Moreover, low voltage is not low risk. A 220 V installation can already cause a fatal shock, a fire or an explosion.

Medium voltage and arc flash: what changes in risk assessment

The new NR-10 also addresses arc flash explicitly. The risk becomes part of occupational risk management, with a specific assessment, a safe working distance and clothing suited to the exposure level.

For PPE selection, the standard sets criteria in Annex IV. When a condition is not covered by that annex, or when a lower protection category than the one indicated is sought, the organization must carry out an incident energy study.

This matters especially at medium voltage. In that range, the energy released by an arc depends on the short-circuit current, the protection clearing time and the working distance. Therefore, choosing arc-rated clothing from a catalog, without a calculation, is no longer a defensible practice.

Where the protection study comes in

Clearing time comes from relay settings and protection coordination. For this reason, an incident energy study is only reliable when it starts from an up-to-date selectivity study.

If the settings changed and the study did not, the cal/cm² figure is no longer valid either.

Training: generic courses are no longer enough

According to CBIC, the Brazilian Chamber of the Construction Industry, the new medium voltage range changes how certain activities are classified and the training requirements for workers. In practice, training must reflect the voltage level each person actually works at.

In addition, the new NR-10 establishes that:

  • training includes theoretical content and supervised practice;
  • the practical content must be delivered in person;
  • training is valid only for the organization that trained the worker and cannot be validated for another company.

For companies that hire contractors, this changes the routine. A certificate issued by another company does not, on its own, prove that a professional is fit to work on your installation.

Other NR-10 changes connected to voltage levels

Besides the new classification, keep an eye on these points:

  • Mandatory Work Permit for non-routine electrical activities, linked to the risk assessment.
  • Periodic testing of gloves, sleeves and other insulating equipment, including items used at low voltage.
  • Residual current devices (RCDs) required in more wet-area circuits.
  • The option to keep technical documentation in digital form.
  • Embargo or shutdown without the NR-3 methodology in the serious and imminent risk situations listed in item 10.16.1.

How to prepare for the new NR-10 by June 2027

Use this roadmap as a starting point:

  1. Survey every installation and classify each one using the new LV, MV and HV limits.
  2. Check whether the organization is part of the SEP or works at medium or high voltage. If so, organize the PIE according to item 10.15.6.
  3. Include electrical risks, arc flash included, in the PGR risk inventory and action plan.
  4. Confirm that the selectivity study reflects the plant’s current configuration.
  5. Assess where an incident energy study is needed and review clothing specifications.
  6. Review the training program: in-person practice, link to the organization and fit with the voltage level.
  7. Update de-energization, lockout and Work Permit procedures.

Start with medium voltage installations. After all, they concentrate the biggest changes in classification and documentation.

Frequently asked questions about NR-10 and voltage levels

When does the new NR-10 take effect?

One year after the publication of Ordinance MTE No. 737/2026, which appeared in the DOU on June 1, 2026. That means June 2027. For sub-item 10.6.4, letter “e”, which applies to existing installations, the deadline is one year after the general effective date.

My company only has low voltage. Does NR-10 still apply?

Yes. Low voltage remains within the scope of the standard whenever there is exposure to electrical hazards. What may change is the obligation to organize documentation as a PIE.

Is a 13.8 kV installation still high voltage?

Not under the new NR-10. It becomes medium voltage, because it sits between 1,000 V and 36,200 V AC.

Do people who worked in high voltage need to retrain?

It depends on the activity, the installation and the company’s training program. Since the requirements were reorganized, the safest path is to review the program with the legally qualified professional in charge before June 2027.

Conclusion

NR-10 now has three voltage levels, and this classification is no longer just a technical definition. It decides whether a company needs a PIE, how arc flash risk must be assessed and what training the team needs.

That is why the first step is simple: know exactly which range each part of your installation falls into. From there, documentation, studies and training have a clear starting point.

This content is for information only and does not replace reading the official text of the standard or an assessment by a legally qualified professional.